Back to 1933

Wednesday 7 May 2025
An impressive operation in the heart of Schiedam. Since 1993, hidden in a canal house, there stood a complete Scotch whisky distillery.

Narrow lifting operations

After 30 years, the kettles are on their way to make whisky again. Using a 3×3-metre roof hatch, we used a 50-metre tower crane to lift the boilers, the largest of which has a diameter of 2.90 metres, out of the building.

Preparations

For this special logistics operation, we had to completely close a through road, including applying for a traffic exemption and setting up two diversion routes.

Transport

The boilers were then lifted out via the roof and loaded onto several trucks for transport to their new destination: Rotterdam Zuid, where they will be recommissioned.

Latest News

Complex logistics operation carried out with only 3 cm of clearance

Complex logistics operation carried out with only 3 cm of clearance

In December, we successfully completed a complex logistics operation on behalf of FB Group, combining precision, experience, and heavy equipment.
M.J. van Riel B.V. takes over all activities of Martens Transport Oosterhout B.V.

M.J. van Riel B.V. takes over all activities of Martens Transport Oosterhout B.V.

M.J. van Riel is delighted to announce that it reached an agreement last Friday to acquire all Martens Transport activities.…
Two storage tanks safely moved and prepared for transport by water

Two storage tanks safely moved and prepared for transport by water

M.J. van Riel recently completed a unique lifting and transport project for a leading client: the careful relocation of two…