M.J. van Riel B.V. recently completed an impressive transport: a unique bridge totalling 55 metres in length, constructed from three parts. This transport from our esteemed client, was finally delivered to the sprayer 14 days ago.
Preparations
This bridge is a high-tech project, with a clearance of only 20 cm above the ground. This made transport extra challenging, but with thorough preparation and close consultation with the customer, we were able to carry it out successfully.
With dimensions of 31 x 7.20 x 4.25 metres and a total weight of 44 tonnes, it was essential to arrange everything to os.de perfection. Thanks to careful route research and tight work preparation, the transport went smoothly.
In the new year
Transport to its final destination in Amsterdam is scheduled for early next year. We will keep you posted on this exciting next step!